Pre-Installation Site Survey Checklist for the POTWASHER
A clean install starts with a site survey: confirm floor space and clearance for the 1030 × 895 mm footprint, three-phase power at 27.4 kW, a ¾" water inlet and 1½" drain, and a φ175 mm exhaust path. Verifying these before the machine ships prevents installation delays.
Space and clearance
Allow the 1030 × 895 × 1825 mm footprint plus front clearance for the fold-down door and rear access for plumbing and exhaust. Confirm doorways and corridors can route the crated machine to the install point.
Power
Confirm 380V / 50Hz / 3-phase service rated for 27.4 kW, with a 10 mm² supply cable and appropriate breaker. If only single-phase is available, order the 220V / 1-phase variant.
Water and drainage
Provide a ¾" inlet at 0.2–0.5 MPa and a 1½" drain with a trap nearby. Check water hardness; below 5 °dH is ideal, otherwise plan a softener.
Exhaust and floor
Route the φ175 mm exhaust to an overhead hood, and ensure a level concrete floor with a drain nearby. A downloadable checklist is provided under Resources.
- Confirm footprint, clearance and routing first.
- Verify 3-phase power (or order the 1-phase variant).
- Provide ¾" inlet, 1½" drain, φ175 mm exhaust, level floor.